In Ningde, Fujian|Smart BESS EV Charing Station
![](https://en.cntepower.com/wp-content/uploads/2023/09/Fujian-Ningde-Convention-and-Exhibition-Centre-Optical-Storage-and-Charging-Inspection-Intelligent-Superch.jpg)
Project size
1030kW/1030kWh
Customer Needs
Provide charging services for new energy vehicles and build a multi-functional new energy integrated service station.
Service Overview
The station covers a total area of about 1,500 square metres and is equipped with one 630kW/618kWh liquid-cooled energy storage system and one 400kW-412kWh liquid-cooled energy storage system, as well as 20 160-180kW high-power charging piles.
Get In Touch
Recent Posts
-
CNTE’s 90th Smart BESS EV Charging Station in operation in Shanghai
Jul 15, 2024 -
CNTE New Smart BESS EV Charging Station Landed in Shanghai
Jul 10, 2024 -
CNTE strategic signing at SNEC 2024 Shanghai
Jul 10, 2024 -
BP Group Co-operation Visit to CNTE
Jul 10, 2024 -
CNTE C&I ESS lands in Czech Industrial Park
Jul 10, 2024